ProjectKlineline Pump Station

Construction of an 18.4 MGD peak flow capacity sewage pumping station which included:

  • Pump Station structure
  • Five (5) 250-hp raw sewage pumps
  • 1,250 kW diesel standby generator
  • Activated carbon odor control system
  • Chemical injection system for odor and corrsion control
  • Connection to existing Klineline Pump Station force mains
  • Modifications to existing Salmon Creek interceptor
  • New watchperson's residence