Bid Room

Pease & Sons, Inc. actively encourages and promotes diversity. We are seeking bids from all qualified and capable firms including large and small businesses as well as Emerging, Small, Women, Minority, Disadvantaged, Native, Veteran, Vietnam Veteran, Disabled Veteran, 8(a), and HUBZone businesses.


To be added to Pease & Sons' subcontractor/supplier database, please download, complete, and return the Subcontractor/Supplier Questionnaire.


New Training Requirement for Businesses

  • As of July 1, 2019, all businesses are required to have training before bidding and/or performing work on public works projects.  Earlier this year the legislature passed ESSHB 1673 adding this training requirement to the responsible bidder criteria in RCW 39.04.350.

 

New Mandatory Certified Payroll Reporting for Businesses

  • Beginning January 1, 2020, all businesses are required to submit certified payroll reports at least once a month to WA State L&I using L&I's online system.  In May, 2019, the legistlature passed Senate Bill 5035 adding this new requirement to the Prevailing Wages on Public Works law (SB 5035 - Section 5).

 

 

Stewart Heights Pool Improvements Boiler Replacement and Solar Loop

Tacoma, WA
Dec 06, 2022
11:00am PST

+

Project Description

($300,000 - $350,000) Replace pool heaters and reconfigure the existing solar water heating system.


Prebid Walkthrough Information

11/21/22 @ 1:00pm @ Stewart Heights Pool, 5715 Reginald Gutierrez Lane, Tacoma, WA


Sierra Treatment System (Valley Water District)

Buckley, WA
Dec 13, 2022
10:00am PST

+

Project Description

Water system improvements within the Valley Water District's Sierra site. The completed work will provide the Owner with a new treatment skid (installed on-site inside the existing building); new piping systems, including underground and above-grade piping to connect to the existing system, new structural mods, elec, controls, and telemetry upgrades; and site restoration


Prebid Walkthrough Information

December 6, 2022 @ 10:00am @ 15630 254th Ave E, Buckley, WA 98321


City of Snoqualmie Kimball Creek Lift Station Improvements

Snoqualmie, WA
Dec 13, 2022
11:00am PST

+

Project Description

($1.05 - $1.3 million) Structural, mechanical, electrical, and automatic control upgrades for the lift station. This project will require temporary bypass of the existing lift station.


Prebid Walkthrough Information

11/29/22 @ 1:00pm @ Kimball Creek Lift Station, 37511 Snoqualmie Parkway, Snoqualmie, WA 98065


Beachcrest Wellfield pH Improvements

Olympia, WA
Dec 20, 2022
2:30pm PST

+

Project Description

($4 - $4.9 million) Construct a potable water aeration treatment facility including: New treatment facility CMU building and packaged aeration unit within the bldg; construct new well building; install 250 LF of 6" and 12" water and 285 LF of 8" and 12" stormwater main; install standby generator; install stormwater pond; decommission existing potable water well; demolish existing CMU buildings; relocate existing building to another city site; install valves, piping, instrumentation, and controls; and construct site improvements, landscaping, and fencing.