Bid Room

Pease & Sons, Inc. actively encourages and promotes diversity. We are seeking bids from all qualified and capable firms including large and small businesses as well as Emerging, Small, Women, Minority, Disadvantaged, Native, Veteran, Vietnam Veteran, Disabled Veteran, 8(a), and HUBZone businesses.


To be added to Pease & Sons' subcontractor/supplier database, please download, complete, and return the Subcontractor/Supplier Questionnaire.


New Training Requirement for Businesses

  • As of July 1, 2019, all businesses are required to have training before bidding and/or performing work on public works projects.  Earlier this year the legislature passed ESSHB 1673 adding this training requirement to the responsible bidder criteria in RCW 39.04.350.

 

New Mandatory Certified Payroll Reporting for Businesses

  • Beginning January 1, 2020, all businesses are required to submit certified payroll reports at least once a month to WA State L&I using L&I's online system.  In May, 2019, the legistlature passed Senate Bill 5035 adding this new requirement to the Prevailing Wages on Public Works law (SB 5035 - Section 5).

 

 

Ferrucci Junior High School Addition and Remodel Work

Puyallup, WA
Apr 06, 2021
1:30pm PDT

+

Project Description

($17 million) Build a new steel framed classroom addition and expand the Commons. Remodel work consists of reconfiguring the admin suite and kitchen server. Update finished in existing hallways. Sitework, landscaping. Additive alternates.


Prebid Walkthrough Information

3/24/21 @ 10:00am VIRTUAL pre-bid meeting via Zoom. Review the specs for additional info.


McNeil Island Water System Replacement

Steilacoom, WA
Apr 27, 2021
3:00pm PDT

+

Project Description

($915,000 - $1.096 million) Complete water source and treatment replacement for McNeil island including site prep, construction of new water treatment bldg, installation of water treatment equipment, installation of well pumps and drop pipe, connection of new water system to Complete water source and treatment replacement for McNeil island including site prep, construction of new water treatment bldg, installation of water treatment equipment, installation of well pumps and drop pipe, connection of new water system to Center (SCC) facility. The work area is outside the secure perimeter of the SCC facility.


City of Aberdeen Sodium Hypochlorite Conversion

Aberdeen, WA
May 05, 2021
3:00pm PDT

+

Project Description

($450,000) Constructing a skid mounted on-site hypochlorite generation system. Included, but not limited to, are hydrogen dilution blowers, water softeners, water and brine filters, brine tank, hypochlorite storage tanks, and metering pumps.


Prebid Walkthrough Information

Virtual WebEx meeting on April 20, 2021 @ 2:00pm.


Pierce County Fuel and Wash Bldg (Bid Package BP 595R-22.0, Mechanical)

Lakewood, WA
May 06, 2021
2:00pm PDT

+

Project Description

Absher is currently the GC/CM on this project. Pease & Sons is bidding on Bid Package BP 595R-22.0, Mechanical. Construction of a 24,640 sqft facility for housing two auto bus washers. The facility consists of a washing and cleaning bldg (13,500 sqft), a fueling canopy (8,980 sqft) and a fueling support bldg (2,160 sqft).


Hood Street Facilities and South Tacoma Pump Station Seismic Upgrades

Tacoma, WA
May 11, 2021
11:00am PDT

+

Project Description

($3.3 million) Demo, structural mods (conc and structural steel) of existing bldgts, excavation around existing facilities, application of CFRP, seismic anchoring and bracing of mech and elec equipment, installation of new roofing system, installation of new HVAC fans, dampers, and louvers, and installation of new buried pipe connections, cathodic protection, application of spray-on polyurea liner, and roof coating at the reservoir.


Prebid Walkthrough Information

April 20, 2021 @ 11:00am @ Hood Street Reservoir, 1002 S Tacoma Way, Tacoma, WA 98409


Wastewater Treatment Plant (WWTP) General Sewer Phase 1 Improvements

Centralia, WA
May 25, 2021
10:00am PDT

+

Project Description

This project includes a new waste activated sludge (WAS) storage system and new mixed liquor recirculation pumps in the existing aeration basins. The Project includes, but is not limited to, two WAS storage tanks with aerators and mixers, two WAS pumps, two blowers, two mixed liquor recirculation pumps, a metal-frame building, and associated electrical, instrumentation and controls, piping, and other components.


Prebid Walkthrough Information

Schedule a site visit with Rick Eaton (reaton@cityofcentralia.com).


Silverdale Pump Stations 19 and 31 Upgrades

Silverdale, WA
May 27, 2021
2:00pm PDT

+

Project Description

Pump Station 19: The proposed station will have two submersible pumps and a backup diesel pump and a total station pumping capacity of 1,440 gallons per minute (gpm) with one pump operating and the largest pump out of service. Pump Station 31: The proposed will have a pumping capacity of 150 gpm with one pump operating and the other pump out of service.


Prebid Walkthrough Information

May 18, 2021 @ 9:00am @ Pump Station 19, intersection of NW Bucklin Hills Rd and Nels Nelson Rd NW, Silverdale, WA


McNeil Island Special Commitment Center (SCC) King Bldg Kitchen Upgrades

McNeil Island, WA
Jun 03, 2021
3:00pm PDT

+

Project Description

Onsite construction inside the secured double fences. Expand electrical room, replace existing medium voltage transformer, switchboard, and panels. Replacement of kitchen utility distribution system. Replace kitchen hoods and exhaust fans.


Prebid Walkthrough Information

May 20, 2021 @ 10:00am @ McNeil Island Special Commitment Center. (Attendees MUST submit to a background check prior to attending the pre-bid. Contact Deborah Woodard at (253) 589-6237 or deborah.woodard@dshs.wa.gov with full name, date of birth and last 4 digits of SSN NO LATER THAN May 13, 2021.)